THEKKADY TOURISM INFRASTRUCTURE ENHANCEMENT PROJECT (TTIEP)

സുസ്ഥിര വികസനത്തിലൂടെ ആഗോള നിലവാരത്തിലേക്ക് • Building a World-Class Sustainable Tourism Destination

A comprehensive public infrastructure enhancement initiative submitted by Make Kerala Great Again (MKGA) to the Government of Kerala, Department of Tourism, Public Works Department (PWD), and District Collector, Idukki.

ESTIMATED BUDGET: ₹40 CRORE TIMELINE: 24 MONTHS Explore 60-Slide Proposal Deck ↓
💰

₹40 Crore

Total Estimated Budget

⏱️

24 Months

DPR to Commissioning

👥

10–12 Lakh+

Annual Tourist Footfall

💼

1,000–1,200

Direct & Indirect Jobs

INTERACTIVE PRESENTATION DECK

Complete Thekkady Project Proposal (60 Slides)

Slide 1 of 60
TTIEP Proposal Slide 1
Thumbnail 1 Thumbnail 2 Thumbnail 3 Thumbnail 4 Thumbnail 5 Thumbnail 6 Thumbnail 7 Thumbnail 8 Thumbnail 9 Thumbnail 10 Thumbnail 11 Thumbnail 12 Thumbnail 13 Thumbnail 14 Thumbnail 15 Thumbnail 16 Thumbnail 17 Thumbnail 18 Thumbnail 19 Thumbnail 20 Thumbnail 21 Thumbnail 22 Thumbnail 23 Thumbnail 24 Thumbnail 25 Thumbnail 26 Thumbnail 27 Thumbnail 28 Thumbnail 29 Thumbnail 30 Thumbnail 31 Thumbnail 32 Thumbnail 33 Thumbnail 34 Thumbnail 35 Thumbnail 36 Thumbnail 37 Thumbnail 38 Thumbnail 39 Thumbnail 40 Thumbnail 41 Thumbnail 42 Thumbnail 43 Thumbnail 44 Thumbnail 45 Thumbnail 46 Thumbnail 47 Thumbnail 48 Thumbnail 49 Thumbnail 50 Thumbnail 51 Thumbnail 52 Thumbnail 53 Thumbnail 54 Thumbnail 55 Thumbnail 56 Thumbnail 57 Thumbnail 58 Thumbnail 59 Thumbnail 60

Our Vision for Thekkady 2030

The Thekkady Tourism Infrastructure Enhancement Project (TTIEP) is designed to elevate Thekkady into one of India’s foremost sustainable eco-tourism hubs. By upgrading physical infrastructure, introducing smart digital visitor management, safeguarding Periyar Lake’s ecology, and empowering local communities, the project creates a long-term socio-economic asset for Kerala.

A one-time strategic investment of ₹40 Crore can generate compounding economic, environmental, and civic dividends for decades, positioning Thekkady as an international model for responsible green tourism.

Top 10 Core Recommendations

1. Smart & Hygienic Restrooms

Automated self-cleaning, touchless sanitary facilities along major tourist corridors and entry gates.

2. Roads & Pedestrian Walkways

Dedicated barrier-free walking paths, illuminated promenades, and smooth road connections in Kumily.

3. Multi-Level Eco Parking

Organized peripheral parking hubs with EV charging stations outside the eco-sensitive forest zone.

4. Smart Navigation & Digital Kiosks

Interactive multilingual info kiosks, real-time bus/boat timing alerts, and digital tourism guides.

5. Zero-Waste & Cleanliness

Decentralized waste segregation, reverse-vending plastic recyclers, and round-the-clock green sanitation.

6. Clean Drinking Water Hubs

RO-purified water refill kiosks throughout the town to eliminate single-use plastic water bottles.

7. Universal Accessibility (Divyangjan)

Wheelchair ramps, tactile paths, and inclusive amenities ensuring Thekkady is fully accessible for everyone.

8. Emergency & Medical Safety

Dedicated 24/7 tourist medical response post, defibrillators, trained lifeguards, and rapid emergency protocols.

9. Solar-Electric Boating Fleet

Modern, silent solar-electric safari boats to prevent water contamination and reduce wildlife disturbance.

10. Environmental Stewardship

Preserving the tiger reserve buffer zone, reforestation of degraded patches, and community eco-guide programs.

Authors & Technical Advisory Board

Sabu Thomas

Lead Author & Project Coordinator

BSEE, MSCE, MBA, PhD (ABD). 33+ years in Engineering, Construction Projects, and Technology (Univ of Illinois Chicago, IIT, Univ of Phoenix).

Tom Pullukat, CE

Engineering Advisor

B.Sc Civil Engineering (NIT Calicut), Univ of Maryland. 40+ years experience in Design & Construction Management of Highways, Transport & Bridges (MassDOT, CDOT).

Tomi Methipara

Strategic & Public Policy Advisor

Retired Police Sergeant. B.Com (Univ of Delhi), B.Sc in Organizational Leadership (Roosevelt Univ, Chicago).

Cyriac Lukose

Project Liaison | MKGA Founder

MS Management of Public Services (DePaul University, Chicago), BA (Osmania University). Global community leader and MKGA coordinator.

4-Stage Phased Implementation

MONTHS 0–6

Stage 1: DPR & Approvals

Detailed Project Report, inter-departmental clearances, forest buffer coordination.

MONTHS 6–8

Stage 2: Tendering

Transparent e-tendering, contractor onboarding, vendor mobilization.

MONTHS 8–20

Stage 3: Construction

Civil works, walkways, parking hubs, sanitation infrastructure & smart kiosks.

MONTHS 20–24

Stage 4: Commissioning

Testing, staff training, handover to operating agencies, full public rollout.

Support the Thekkady Project Movement

Join our active citizen working group, provide local insights, or contribute domain expertise to help realize the Thekkady Tourism Infrastructure Enhancement Project.